The Iowa Avenue Grade Separation project provided the separation of a major arterial street with the BNSF mainline tracks within an industrial area of the City.  Iowa Avenue was reconstructed to cross over the tracks, being placed on a 3-span pre-stressed cast-in-place concrete box girder structure, measuring  458 feet in length, and 102 feet wide, supported on steel driven “H” piles.  Mechanically stabilized earth retaining walls were used to narrow the fill footprint of Iowa Avenue.  The reconfiguration of utility facilities and the realignment of several street intersections includes an access road under the bridge to maintain access to business properties. 

Southstar provided the Structure’s Representative Bridge Construction Management services which include the following:

  • Bridge Construction coordination with the City of Riverside and BNSF
  • Material testing and frequency testing
  • Weekly job meetings
  • Daily work reports
  • Prepare quantities and administer payments
  • Quality Assurance for Bridge and MSE Wall Construction
  • City Representation for Structures operations, design issues, and items
  • CCO reviews and recommendations
  • Submittal reviews for falsework, shoring, pile placement, MSE wall Shop Drawings
  • Line and Grade Control, Survey Coordination
  • Safety and BNSF regulations were adhered to

Location

Riverside, CA

Completion Date

April 2014

Construction Capital Cost

$32 Million