Southstar provided Construction Management, Inspection, Materials Testing and Surveying services for the Pearblossom Highway Reconstruction project in Palmdale, California. Pearblossom is a major trucking route under the desperate need for reconstruction. The Southstar team kicked off this $13.5M project with a high level of precision. The construction staging and schedule were developed to minimize impacts to the businesses and schools and to minimize detours and closures to keep traffic flowing at all times.

As such, the Project was broken down into three 90 day segments:

  • Segment 1: 25th East to 35th East
  • Segment 2: 35th East to 45th East
  • Segment 3: 45th East to 55th East

Improvements also included traffic loops, bicycle detection, and pedestrian push button modifications, signing and striping, curb ramps/curb returns to meet current ADA standards, adjustment of utilities to grade, delineators, etc., all of which we have provided on many projects. Our depth of experience has taught us how to expertly lead roadway improvement projects, and predict potential schedule delays.

Location

Palmdale, CA

Construction Capital Cost

$13.5 Million

Services